Background
Beijing Bird's Nest Stadium, located in the southern part of the central area of Beijing Olympic Park, was the main stadium of the 2008 Beijing Olympic Games. It covers an area of 204,000 square meters, with a construction area of 258,000 square meters. The stadium can accommodate 91,000 audiences. After the Olympic Games, it became a large-scale professional place for Beijing citizens to participate in sports and entertainment. It became a landmark sports building and Olympic legacy.
Challenge
Solve the problem of blind zones of signal coverage.
Huge call volume and limited channel resources.
Strong anti-interference ability is required.
Improve work efficiency and ensure safe operations.
Empower the staff and volunteers with reliable and convenient communication supports.
Solution
According to the comms needs of the Bird's Nest, Kirisun adopts the advanced DS6000 digital trunking system to build a set of 8-carrier base stations, including 15 shared channels, 1 center node switch, 1 recording server, 1 dispatching server, 2 dispatching clients, and 400 DP990 portable radios.
In addition, we have also deployed 1 optical fiber transceiver and a n indoor antenna feeder in the venue office to eliminate the shielding of radio signals in the steel-concrete building.
System Topology
Benefits
Various call types, including individual calls, group calls, and all calls, together with flexible grouping.
High channel efficiency with dynamically allocated and managed channels.
Strong anti-interference capability, superior audio quality, and long communication distance.
Wider coverage to ensure there are no blind spots of signal.
Highly durable devices, able to withstand harsh environments.
Related Products